Posted inSaudi Arabia

A look at Saudi Arabia’s Red Sea International Airport


Warning: Undefined variable $term_obj_list in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Trying to access array offset on value of type null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Attempt to read property "name" on null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Footage of the upcoming Red Sea International Airport has been shared as it readies for flights this year

A recent drone video offers an update on the construction progress of the Red Sea International Airport, which began in 2021.

The airport is located 15 kilometers inland from the Red Sea coastline. Designed by British architectural firm Foster + Partners, the airport features a curved structure with five pods arranged around a central area for arrivals and departures. The design aims to reflect the desert terrain.

The airport is expected to accommodate up to one million passengers annually by 2030 and is intended to serve tourists visiting The Red Sea Project, a resort destination. The video also showcases other elements of the tourist development, including a ring-shaped hotel on stilts and a desert-integrated resort, both also designed by Foster + Partners.

Gerard Evenden, head of studio at Foster + Partners, shared, “The Red Sea International Airport has been conceived as a gateway to one of the world’s most exceptional resorts, seamlessly woven into the fabric of the overall visitor experience. Drawing inspiration from the desert’s palette of colors and textural elements, the design endeavors to curate a serene and opulent journey through the terminal, positioning it as a pivotal transit hub for incoming visitors, whether by land or by air.”

All the hotels at Saudi Arabia’s The Red Sea

In its first phase, the destination will see 16 hotels and 3,000 keys this year and 2024. The Red Sea will house its own water bottling facility, as well as a renewable energy plant, with plans to have the entire resort powered by sustainable energy. The multi-billion-dollar site is one of the key projects of the Saudi Vision 2030 – a country-wide economic diversification project to move the Kingdom away from just oil revenues.

The hotels are: