Posted inTourism

US$1bn Hayy Al Sahil tourism project in Muscat revealed


Warning: Undefined variable $term_obj_list in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Trying to access array offset on value of type null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Attempt to read property "name" on null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

The first phase of the 1.3 million sq m tourism project will cost $104m (OMR40m)

Hayy Al Sahil

Hayy Al Sahil is a US$1bn project from Oman’s Qurayyat Development Company in Wilayat of Quriyat, Muscat.

Hayy Al Sahil project aligns with the government’s plans to enhance tourism as one of the sectors of economic diversification programme within the tenth five-year plan. The cost of the project is estimated at $1bn (OMR385m). The first phase of the 1.3 million square metres project will cost $104m (OMR40m), a report by Oman News Agency confirmed.

Sheikh Hilal Khalid Al Maawali, chairman of the board of directors of Qurayyat Development Company, said that the project will be developed in three phases owing to its large size. He added that it will constitute a valuable addition to the infrastructure of Omani tourism. He pointed out that the project will position the Wilayat of Quriyat as an attractive destination for mega projects that will benefit everyone, especially citizens of Qurayyat.

The first phase of the 1.3 million square metres project will cost $104m (OMR40m) [Image: Oman News Agency]

Eng Khamis Mubarak Al Kiyumi, chairman of the board of directors of Al Madina Real Estate Company, which said that the basic designs of the project were envisaged to combine modernity and the original Omani architectural touch.

Hayy Al Sahil project will enhance the utilisation of the fishing port by developing a floating dock for yachts, which will facilitate visitors’ movement across Muscat’s tourist ports and other tourist ports in Oman.

The first phase of the project includes preparing the infrastructure for the project [Image: Oman News Agency]

The first phase of the project includes preparing the infrastructure for the project, building 400 housing units, and establishing a 4-star hotel with 220 hotel rooms, including 100 chalets, as well as a residential-commercial district on an area of 53,000 sq m.

The second phase, which is the largest in the project, will add 1,600 residential units and a large mosque on a 10,000 sq marea, in addition to a three-star hotel housing 150 rooms. The second phase will also include expanding the first four-star hotel on the waterfront by adding 120 rooms and suites.

As for the third and final phase, it will include constructing 3000 different housing units ranging between apartments and villas and 36 luxury villas on the waterfront of the project, in addition to adding 180 new rooms to the three-star hotel, and establishing another five-star hotel with 200 rooms.