Posted inBusiness

Plans unveiled for rotating eco-hotel in Qatar


Warning: Undefined variable $term_obj_list in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Trying to access array offset on value of type null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Attempt to read property "name" on null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

The Eco-Floating Hotel is being pitched by a Turkish design firm, set for completion in 2025

An ambitious architectural and design firm born out of Istanbul has unveiled its concept for a futuristic hotel in Qatar.

While Dubai often steals most of the headlines for its space-age buildings and hotels, Hayri Atak Architectural Design Studio (HAADS) is looking to put Qatar on the map with its Eco-Floating Hotel set for completion in 2025.

First revealed on Instagram, the hotel will be located off the shores of Qatar and use the sea as inspiration for its design. Thanks to a rotating pier around the perimeter, the hotel will create a whirlpool in its centre to power various facilities.

In addition, its vortex-inspired roof will connect rainwater to later be used as greywater or to nourish green areas of the property. It rains around nine days a year in Qatar but clean water will also be obtained by purifying the seawater. 

The 152-key hotel can be accessed via a connecting road, helicopter or boat.  Other facilities will include an indoor and outdoor pool, a sauna, gym, mini-golf course and a range of other recreational areas.

Perhaps most innovative of all, HAADS says the hotel will be able to detach from the mainland and be moved around. It also said the floating hotel can be rented out.

“All of the hotel’s platforms, including its connection to the mainland are floating platforms. Due to the fact that it will be rented periodically, it can be moved to the desired area after obtaining the flow it needs, and it will not need any other requirements. However, the concept works of the project have been completed and approved,” it revealed.

It said in the same post the firm is still conducting “feasibility and technical studies” to start the implementation of the concept.