US aviation regulators are investigating Boeing’s 787 Dreamliner, after one of the planes sparked a grass fire at an airport during preflight testing.
One of the commercial planes “experienced an engine issue” on Saturday at a runway in Charleston, South Carolina, Boeing said, adding that debris from the aircraft fell onto grass, starting a fire.
The plane’s engines are manufactured by General Electric.
There were no injuries, said the US planemaker, adding that the US National Transportation Safety Board is now in the early stages of investigation into the incident.
Boeing said it was “unaware of any operational issue that would present concerns about the continued safe operation of in-service 787s powered by GE engines”.
The incident is the second in quick succession for the much-delayed Dreamliner. On 23 July, All Nippon Airways – the launch customer for the craft – grounded five of its 787s, claiming they had a gearbox problem.
The 787, which Boeing says reduces fuel burn by about 20 percent, is three years behind its original schedule because of problems with Boeing’s global supply chain. The A350, manufactured by competitor Airbus, has also been delayed, with deliveries due in the first half of 2014.
“We’ve exchanged a total of seven engines in five aircraft, cancelling two domestic flights,” the ANA spokeswoman told AFP, adding that Rolls-Royce discovered the defect – corrosion inside the gearbox – during endurance tests.
Earlier in the year, Boeing said about 55 of its Dreamliners were at risk of developing a fuselage problem.
ANA is due to take delivery of 55 Dreamliners by 2017. The aircraft is an integral part of the carrier’s expansion plans internationally. ANA is currently operating the 787 on eight domestic routes and its Haneda to Frankfurt route. ANA is due to launch new 787 services from Tokyo to Seattle and San Jose on the US west coast in the current fiscal year ending March, 2013.
Abu Dhabi-based airline Etihad Airways has 41 of the 300-passenger aircraft on order for a total of US$9.3bn. Rival Qatar Airways has 60 Dreamliners on order, including options, and will be the first Middle Eastern carrier to take delivery, with five 787s due to arrive this year.
