Posted inHotelier Middle East

Yas Island’s 2010 timeline


Warning: Undefined variable $term_obj_list in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Trying to access array offset on value of type null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Attempt to read property "name" on null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

A breakdown of Yas Island's future milestones

Q4, 2009 Phase 1:

Yas Marina Circuit
The 5.55km circuit designed by Hermann Tilke hosted the inaugural 2009 Formula 1 Etihad Airways Abu Dhabi Grand Prix from October 30 to November 1.

The Yas Hotel
Built in 22 months, The Yas Hotel is Aldar Hotels and Hospitality’s first owned and operated property comprising two buildings connected by a bridge; one sits on the Yas Marina Circuit and the other on the Yas Marina.

Crowne Plaza Abu Dhabi Yas Island (428 rooms)
Staybridge Suites Abu Dhabi Yas Island (165 rooms)
Yas Island Rotana Abu Dhabi (308 rooms)
Centro Yas Island Abu Dhabi (259 rooms)
Radisson Blu Abu Dhabi Yas Island (204 rooms)
Park Inn Abu Dhabi Yas Island (204 rooms)

Yas Marina
The super-yacht marina has capacity for more than 140 yachts and is located in the middle of the Yas Marina Circuit. The project is Aldar’s flagship marina development.

Q1, 2010

Yas Links Abu Dhabi Golf Course
Expected to open in March, this links golf course is an 18-hole championship course designed by Kyle Phillips. The golf course is in close proximity to the seven hotels and is set against a coastal backdrop.

Q2, 2010

Yas Yacht Club
The yacht club is a multi-functional venue that caters to casual dining, private members dining and corporate entertaining.

Phase 2: Q3-Q4, 2010

Ferrari World Abu Dhabi
The world’s first Ferrari theme park is expected to be the largest indoor theme park globally and home to the world’s fastest roller coaster and 20 ride attractions.

Yas Mall
(completion date to be confirmed (TBC))
The Yas Mall features a wide range of retail categories across 500 stores, including the largest IKEA store in MENA.

Yas Island Water Park (TBC)
Currently in the design and concept phase, preliminary plans include up to 26 water rides and attractions across 15 hectares of land next to Yas Mall.

Warner Brothers Theme park (TBC)
The delivery of the theme park is being finalised, but developers say it will include many of the Looney Tunes, Hanna-Barbera & DC comic characters.

Phase 2-3:

Ongoing
Residential
The island also will offer a variety of modern low-rise and mixed-use residential apartments, including villas to rent, lease and own.

Future hotels
In total, Yas Island is expected to have 20 hotels by the time it is completed.