Posted inNews

What will Palm Jebel Ali look like? Time Out Dubai unearths info


Warning: Undefined variable $term_obj_list in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Trying to access array offset on value of type null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Attempt to read property "name" on null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Palm Jebel Ali will one day have 80 hotels and resorts

What will the Palm Jebel Ali look like? Sleuths over at sister publication Time Out Dubai may have the answer. With the project dating all the way back to 2002, Time Out has unearthed the original plans for the mega-island before it was put on hold amid the financial melt down.

From the original map, as seen above, there was a ‘Gateway Bridge’ planned for the original Palm Jebel Ali. Further renders of the Gateway Bridge, which was also referred to as the Royal Haskoning Bridge, show large futuristic-shaped buildings at the end of the Palm Jebel Ali’s trunk.

If similar to the original plans, the buildings will have a sail-like shape and will create a grand entrance to the Palm’s fronds.

Palm Jebel Ali plans
The Gateway Bridge on the Palm Jebel Ali original plans
Palm Jebel Ali plans
Futuristic buildings of the Gateway Bridge on Palm Jebel Ali plans

Other renders of the Palm Jebel Ali from 2007 show details on what will be placed where on the fronds.

Originally, the crown at the top (the space in yellow above the fronds) was planned to be palaces or properties only owned by Emiratis. The outer marinas were originally meant to have yacht clubs.

Palm Jebel Ali plans
Palm Jebel Ali plans: The entire Palm
Palm Jebel Ali plans
Palm Jebel Ali plans: Crescent D

The render above shows the proposed Crescent D being built-up with residential towers and five-star hotels (marked in green).

The plans also describe that the area will have a ferry terminal which will provide a pick-up and drop-off service for the island’s marine-based transport systems.

All the blue buildings shown represent the residential buildings. But with 80 hotels in the pipeline, we can expect new restaurants, beach clubs and attractions across the 110 kilometres of additional coastline in the coming years.

Palm Jebel Ali plans
Palm Jebel Ali’s proposed Marina

The Palm Jebel Ali was dredged in 2002 and the pictures were first released in 2007 by developers

How big is Palm Jebel Ali?

The island of Palm Jebel Ali spans an impressive area of 13.4 square kilometers, making it twice the size of Palm Jumeirah. It aims to add 110 kilometers of coastline to Dubai, enhancing the city’s waterfront appeal.

What will be on Palm Jebel Ali?

The project plans to accommodate more than 80 hotels and resorts, offering a wide range of options for tourists and visitors.

Palm Jebel Ali aims to provide new beachfront homes for approximately 35,000 families, catering to a diverse range of residents. The project will also offer a plethora of entertainment and leisure facilities, further contributing to Dubai’s thriving tourism sector.

Are there any stand-out facts?

One of the significant highlights of Palm Jebel Ali is its commitment to sustainability. Approximately 30 percent of the project’s energy will be sourced from renewable sources, showcasing the nation’s dedication to environmental sustainability. The giga-project’s emphasis on incorporating sustainable practices aligns with Dubai’s overall sustainability commitments.

Didn’t Palm Jebel Ali close years ago?

The history of Palm Jebel Ali dates back to its initial launch in 2002. The project involved extensive dredging and land reclamation, with sand from the seabed used to create the island’s distinctive shape. The development plans encompassed residential areas, commercial zones, leisure facilities, marinas, and luxury hotels and resorts.

However, the construction of Palm Jebel Ali faced significant challenges and delays. The global financial crisis of 2008 had a substantial impact on Dubai’s real estate market, leading to a slowdown in construction projects. As a result, the Palm Jebel Ali project was put on hold, and large-scale construction never resumed.

That is, until now.

When will it open?

While specific opening dates have not been announced, Palm Jebel Ali aligns with the Dubai Economic Agenda D33 by 2033 and the Dubai 2040 Urban Master Plan. These strategic frameworks aim to drive the growth and development of Dubai, propelling it towards becoming a world-class city.