Posted inHotelier Middle East

Aloft Abu Dhabi goes solar


Warning: Undefined variable $term_obj_list in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Trying to access array offset on value of type null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

Warning: Attempt to read property "name" on null in /var/www2/dev.hoteliermiddleeast.com/wp-content/themes/newspack-hme/template-parts/header/entry-header.php on line 69

German manufacturer Wolf GmbH supplies Aloft Abu Dhabi solar panels

Up to 90% of hot water at the Aloft Abu Dhabi hotel will be supplied from solar-generated energy through solar panels that have been supplied by Germany-based manufacturer Wolf GmbH.


More than 560 solar panels covering an area of 2300m² have been installed on the roof of Car Park A at the Abu Dhabi National Exhibition Centre (ADNEC).

The panels utilise the infra-red component of sunlight, generating energy to heat water that supplies the hotel’s 408 bedrooms, two production kitchens, F&B outlets, offices and the swimming pool, saving an estimated 870 mega watt hours of electricity a year.

“In line with Abu Dhabi’s 2030 vision for sustainable economic development, we are following the environmental objectives of the emirate by diversifying our power requirements away from traditional sources of energy,” said His Excellency, ADNEC managing director Ali Bin Harmal.

Last month, ADNEC also introduced a major recycling programme to support the Abu Dhabi’s recycling agenda.

Recycling stations were installed throughout the venue. One month into the programme ADNEC was able to recycle almost 5000 kilogrammes of paper, cartons, magazines, plastic and aluminum-can waste, according to the company.