Oman’s national carrier, Oman Air, has bought the Golden Tulip Seeb hotel.
The property, located opposite Muscat’s Seeb International Airport – Oman’s Air main hub – and next to the airline’s main office was wholly purchased last week, Oman Air CEO Peter Hill revealed.
However, Golden Tulip will still manage the property on the airline’s behalf.
“No we will be looking to see how we can work with Golden Tulip to direct where that hotel is going,” said Hill.
“It hasn’t had much investment and needs a refurbishment so we’ll sit down and work it out.”
Hill did not confirm whether or not the airline would be purchasing additional hotel properties.
“We’ll see how we go with this product first,” he added.
The hotel division is one of five Oman Air business units including the airline.
Hill’s right-hand man, chief commercial officer, Barry Brown, also revealed that the airline’s tour operating arm – Oman Air Holidays – was being developed.
“What we would like to do eventually is build a fully-fledged tour operation with our own coaches and hotels etc,” he said.
In the meantime, the holidays division is developing outbound packages to some of its new destinations including the UK, Thailand, France, Germany Sri Lanka and The Maldives, with the offering spanning a wide range of budgets.
However, the inbound offering – targeting residents of Europe and the GCC in particular – is pitched at “the top-end tourist”, said Brown.
Hill added that with Oman’s close proximity to Yemen, the airline and it’s leisure division was well placed to expand its holiday offering into the neighbouring country sometime in the future.
And if that wasn’t enough to keep the Oman Air team occupied, Hill said the airline was also considering running pleasure flights, similar to those operated by sea plane specialist Seawings in Dubai, involving sightseeing tours of Oman.
Hill and Brown were speaking at a press conference in Muscat today where they launched Oman Air’s first brand new A330-300 aircraft, which was delivered last Friday.
Four new A330s – two 200s and two 300s – will be operating by the end of the year, with three more on order taking the total to seven.
Two Boeing 777s are also on order, as well as six Boeing 787 Dreamliners, delivery of which has now been postponed from 2012 to 2014.
